Thursday 7/11/2013

Weather: Sunny  94˚/62˚

Subs on Site:
<Huskies>                        (5)
<Wall to Wall>                  (4)
<G&M Woods>                 (2)
<Red Oak>                       (2)

Work in Progress
(Huskies) Installed sod on the island against 2500 W and finished around Building 'D'.

(Wall to Wall) Sprayed the trim on Building 'A'.

(G&M Woods) Lowered the counter tops in the Clubhouse to ADA height.

(Red Oak) Reinstalled the sinks in the Clubhouse and repaired a leak in B205.