Monday 6/25/2012


Weather Sunny & Windy 96˚/54˚


Subs on Site
<Red Oak>            (7)
<DG Concrete>      (4)
<Horrocks>            (1)

Work in Progress:
(Red Oak) Finished forming South Breezeway walls and the East side of middle section.  Inspected and poured.

(DG Concrete) Re-Compacted the footings on Building 'C' garage.  Compaction passed on all but one corner.  Started digging a filling footings on Building 'B' garage.  Chris (DG Concrete) started on fire lane prep.  (DG Concrete) added 3 yrds of concrete to (Red Oak's) pour for trust blocks.

I was unloading lumber until after 8 PM.