Tuesday 6/26/2012


Weather Sunny & Windy 96˚/60˚


Subs on Site
<Red Oak>            (7)
<DG Concrete>      (4)

Work in Progress:
Wayne (Extreme Fire) met with Jeremy and Ryan (Fire Marshall) and conducted a flow test on the fire hydrants.



(Red Oak) Stripped forms South Breezeway walls and the East side of middle section.  Started tieing bar and forming for the north section.


(DG Concrete) Re-Compacted the footings on Building 'C' garage. Finished digging and filling footings on Building 'B' garage.  Chris (DG Concrete) Fire lane prep.  Jesse (DG Concrete) Backed off a 3 foot cliff with the water truck,  Chris (DG Concrete) told him he has to be aware of everything around him while operating equipment.  15 seconds later Jesse (DG Concrete) hit the fire hydrant.  Brandon (Maeser) came to collect a sample for the 2nd of 2 bacterial cultures on our water line.