Friday 9/21/2012


Weather: Sunny  81˚/43˚

Subs on Site
<Utek>                         (11)
<Red Oak Plumbing>    (5)
<Red Oak>                   (7)

Work in Progress:
(Utek) delivered a tower crane with a man basket.  Continued 4th floor Building 'A' walls. Built interiors on 3rd floor as well as completing the clean up of all brackets and bracing.

(Red Oak Plumbing) back filled Building 'B' underground.  We discovered that Ether had missed the Type 'A' unit so they dug it back up and changed the layout on that unit.

(Red Oak) Poured the breeze way and patios on Building 'E'.