Friday 9/7/2012


Weather: Partly Cloudy  80˚/52˚

Subs on Site
<Reliance>                   (3)
<Red Oak>                  (10)

Work in Progress:
(Reliance)pulled temp power to Building 'D' & 'E'

(Red Oak)Poured the southern 2/2 walls on Building 'B' then missed inspection on the Club House walls. I called and rescheduled for later.  They passed inspection and poured the Club House walls.