Weather: Partly Cloudy  21˚/2˚ 

Subs on Site
<Warburtons>                (7)
<Nutek>                          (14)
<Air Doctors>                  (4)
<Extreme Fire>               (3)
<Utek>                            (20)
<Reliance>                      (5)
<Red Oak Plumbing>      (3)

Work in Progress:
(Warburtons) worked on siding for the North Breeze way and the siding and Soffit on the West center section of Building 'A'.  Finished dry-in on Building 'C'  

(Nutek) Hung Sheetrock on 3rd floor units.  Continued taping on 1st floor of Building 'A'

(Air Doctors) installed ducts on 3rd floor of Building 'A'

(Extreme Fire) worked on the attic system for Building 'A' North end.  Cut the sprinkler heads for 3rd floor Building 'A'

(Utek) Set roof sections on Building 'D' finished the sheer tie-ins and details on 4th floor of Building 'E'.  Built floor section for Building 'B'

(Reliance) Drilled and boxed on Building 'C'

(Red Oak Plumbing) Worked on the gas lines for the  West side of the 1st and 2nd floors Building 'C'