Wednesday 3/27/2013


Weather: Sunny 62˚/38˚ 

Subs on Site
<Sterns>                          (6)
<SBS>                              (4)
<Wall to Wall>                  (3)
<Nutek>                            (7)
<Cardalls>                        (5)
<Warburtons>                  (8)
<Diamond Z>                    (3)
<Air Doctors>                   (3)
<Reliance>                       (2)
<Red Oak Plumbing>       (3)

Work in Progress
(Sterns) Poured the first 100' of sidewalk around Building 'A' and formed the second 100' and the stairs on the South West entry.  They had to cut out and replace the ADA ramp on the South East curb.

(SBS) Finish work on 1st floor Building 'E'.  Replaced the ADA shelves in Building 'A' that were installed too low.

(Wall to Wall) Prepped 3rd and 4th floor on Building 'D' 

(Nutek) Hung pre Rock on Building 'B' 3rd and 4th floor South Tower.  Fire Taped 2nd, 3rd and 4th floor South tower in Building 'B'.

(Cardalls) Insulated 2nd and started on 3rd floor North Tower of Building 'B'.  

(Warburtons) Worked on the breezeway on 4th floor of Building 'D'.  Siding on the South side of Building 'E'.  And the entry gables on the North side of Building 'D'.

(Diamond Z) Installed lath on Building 'B'

(Air Doctors) Trim for Building 'C'.  Line sets in 1st floor Building 'B'

(Reliance) Worked on trim in Building 'C'. 

(Red Oak) Install trim in Building 'C'. Stocked their water heaters in the units for Building 'E'.

While Sterns was cutting the concrete in front of Building 'A' the smoke from the saw got into the riser room smoke detector.  The fire alarm went off.  It called the entire Uintah County fire department.