
Subs on Site
Keith (DG Concrete) (4)
Work in Progress:
Set up account at Maeser Water for temp water. They will bill each month and refund the deposit at the end of the job.

Grubbed site. Started removing top soil.
Rulon (Reliance Electric) met with Mike (Strata Networks) about temporary phone.
Mrs Shaw (The Neighbor)came by and was concerned about her fence with the top soil removed. We have left 2-3 feet undisturbed away from her fence.

.