Monday 4/30/2012
Weather
Sunny 76˚/49˚
Subs on Site
Keith (DG Concrete) (3)
Work in Progress:
Pre-Con with Brandon (Maeser Water) got check for temp meter
Keith (DG Concrete) delivered a front end loader.
Newer Post
Older Post
Home