Thursday 5/16/2013

Weather: Partly Cloudy 83˚/48˚   Light rain 

Subs on Site
<Huskies>                        (3)
<G&M Woods>                 (3)
<Warburtons>                  (6)
<Air Doctors>                   (4)
<Red Oak>                       (4)
<DG Concrete>                (3)

Work in Progress
(G&M) Installed on the 2nd floor of South tower in Building 'B'.  They installed cabinets in A103 kitchen and patched the cabinets in A203.

(Huskies) Continued trenching around 'D'. 

(Wall to Wall) Painted the trim on the remainder of Building 'C' and started painting the body.

(Warburtons) Touched up and replaced trim on Building 'C' where they had left hammer marks.  Finished the West side of Building 'B' and worked on the top of the South end.  They also installed the remainder of the Building signs.

(Air Doctors) Installed ducts and furnaces in the North Tower Building 'B'.  Caulked the penitrations on B, D, and E. 

(Red Oak) Installed trim in Building 'E'.

(DG Concrete) Built the last rock wall behind building 'C' and dug out the patios.

Dusty (Maeser Water) Set the cans and meters for building 'B'.