Weather: Partly Cloudy 85˚/54˚
Subs on Site
Subs on Site
<Huskies> (5)
<Wall to Wall> (3)
<Sterns> (4)
Work in Progress
(Huskies) Worked on final grade and sprinklers around the Clubhouse.
(Wall to Wall) Prepped the South end of Building 'B' there were hundreds of nails in the face of the siding.
(Sterns) Poured the dumpster pads for 'B' and 'E'.
This weekend while Mario was borrowing the lift to tighten the steel bolts a couple of Sterns employees got in the painters lift and raised it up as high as it would go. They got locked out of the controls and could not get down, They called the Fire department but another Sterns employee figured out how to get them down from the bottom controls.
Mario worked on installing the partitions in the ClubHouse bathrooms.
This weekend while Mario was borrowing the lift to tighten the steel bolts a couple of Sterns employees got in the painters lift and raised it up as high as it would go. They got locked out of the controls and could not get down, They called the Fire department but another Sterns employee figured out how to get them down from the bottom controls.
Mario worked on installing the partitions in the ClubHouse bathrooms.