Subs on Site
<Cardalls> (2)
<Warburtons> (12)
<Nutek> (3)
<Diamond Z> (3)
<Extreme Fire> (4)
<Air Doctors> (4)
<Utek> (19)
<Red Oak Plumbing> (5)
Work in Progress:
(Cardalls)Insulated the walls on the 2nd Floor for Building 'A'.
(Warburtons) started siding on both sides of the center section of Building 'A' as well as Building 'A' garage.
(Diamond Z) stoned the North end of Building 'A'.
(Extreme Fire) worked on the attic system of Building 'A'
(Air Doctors) drilled holes in the hard duct for 1st floor of Building 'A' . They also strapped the vents in the attic.
(Utek) set the roof sections for Building 'C'. Framed the Club House walls. Set the floor sections on Building 'D' & 'E'.
(Red Oak Plumbing) ran the water lines for the South side 3rd floor. Set the ADA tubs. And fire caulked the 4th floor.
(Red Oak Plumbing) ran the water lines for the South side 3rd floor. Set the ADA tubs. And fire caulked the 4th floor.