Subs on Site
<Wholesale Flooring (4)
<Wall to Wall> (2)
<Wall to Wall> (2)
<SBS> (3)
<Nutek> (10)
<Nutek> (10)
<Diamond Z> (3)
<Air Doctors> (7)
<Warburtons> (8)
<Reliance> (5)
<Red Oak> (6)
<DG Concrete) (3)
<DG Concrete) (3)
Work in Progress
(Wholesale Flooring) Installed Vinyl in Building 'E'. Finished the carpet in Building 'C'.
(Wall to Wall) Touch up in Building 'C' North Tower.
(Wall to Wall) Touch up in Building 'C' North Tower.
(SBS) Installed the steel Patio Doors and started trim on the North End of 1st floor Building 'B'.
(Nutek) Taped on 2nd floor Building 'B'. Hung 2 units on the 3rd floor and started on the 4th floor North Tower of Building 'B'. Touch-up in Building 'C'.
(Diamond Z) Continued the stone on the East Columns and South end of Building 'B'.
(Air Doctors) Checked the flue lines for 6 of the water heaters and furnaces on Building 'C'. Started setting furnaces in Building 'D'. EJ turned on the heaters in Building 'D' and one of the doors got closed onto the heater. The smoke detector went off even with the cover still on it. EJ found the fire and put it out (See Picture below).
(Warburtons) Siding in the corridors and patios of Building 'B'.
(Reliance) Trim on Building 'E'. Installed the fire panel in Building 'C' and 'D'.
(Red Oak) They cleaned up their trash piles on site. Started installing the drain lines for the water heaters in Building 'C'. Stocked their water heaters into Building 'D'.
(DG Concrete) Finished installing drains in the window wells around Building 'C' so that the run off from the roof would not fill them. We installed window wells on Building 'D' so that they could continue with rock walls and backfill. The tire on the backhoe went flat and Bob (DG Concrete) took it off and had it repaired $140.