Subs on Site
<Reliance> (3)
<Red Oak Plumbing> (6)
<Red Oak> (3)
<DG Concrete> (4)
Work in Progress:

(Red Oak Plumbing) readied the underground in the first half of Building 'A' for inspection, passed inspection, and back filled the trenches.
(Red Oak)formed the footing in Building 'C' garage footings so the could back fill them to allow accese all around for Building 'C'.
(DG Concrete) back filled the North end of Building 'A' slab, installed strom drain pipe and pressure tested the sewer line from Main St to our first manhole.