Monday 10/22/2012


Weather: Rain  68˚/41˚


Subs on Site
<Questar>                    (3)
<Utek>                          (18)
<DG Concrete>             (2)

Work in Progress:
(Utek)Framed on the exterior of Building 'E'.  Pre-fabbed sections of trusses on Building 'A'.

(DG Concrete) graveled the last of Building 'B' floor and started on dumpster pads.


(Questar) ran service to Buildings 'B','D' & 'E'






(Utek)Willard ran into one of (Utek)'s truck with their forklift.  The sheriff was called.