Weather: Rain 68˚/41˚
Subs on Site
<Questar> (3)
<Utek> (18)
<DG Concrete> (2)
Work in Progress:
(Utek)Framed on the exterior of Building 'E'. Pre-fabbed sections of trusses on Building 'A'.

(DG Concrete) graveled the last of Building 'B' floor and started on dumpster pads.
(Questar) ran service to Buildings 'B','D' & 'E'
(Utek)Willard ran into one of (Utek)'s truck with their forklift. The sheriff was called.