Subs on Site
<Extreme Fire> (3)
<Air Doctors> (4)
<Reliance> (5)
<Utek> (19)
<Red Oak Plumbing (2)
Work in Progress:
(Extreme Fire) Tested the 1st floor fire sprinklers

(Air Doctor) stared on more vents for Building 'A" but we may have a problem with using PVC
(Reliance) boxed out the 1st floor units and started drilling holes
(Utek) set up to 80% of the trusses on Building 'A', sheeted Building 'C' 2nd floor, Built interiors on Building 'E' 1st floor and continued pre-fab of the wall units.

(Red Oak Plumbing) ran vent pipes on Building 'A' 2nd floor.