Subs on Site
<Air Doctors> (3)
<Utek> (6)
<DG Concrete> (2)
Work in Progress:
(Air Doctors)Arrived this morning looked over the Building and remodeled their on site camp trailer.
(Utek)framed more walls on the Southern half of the first floor of Building 'B'

(DG Concrete)started on the valve boxes in the road. They were called away at lunch to help Bob (DG Concrete) get ready for their asphalt because he made some sort of mistake.
Dennis (Ram) came by the site. He was looking for the locks they had installed on the conex and fence around the lumber yard