Weather: Cloudy 82˚/54˚
Subs on Site
<TouchStone> (14)
<Red Oak> (8)
<DG Concrete> (3)
Work in Progress:

(Red Oak) poured Building 'E' walls, and Building 'E' Breeze way walls. Then continued forming Building 'B' footing.
(DG Concrete) Built ramps for the framers on each end of Building 'A'. Graded for sidewalk on Building 'C'. Touched up Building 'B' footing holes for (Red Oak)