Tuesday 8/28/2012


Weather: Partly Cloudy  88˚/59˚

Subs on Site
<Sterns>                      (12)
<TouchStone>             (16)
<Red Oak>                   (7)
<DG Concrete>            (2)

Work in Progress:
(Sterns) poured the end sections were they could not slip.  Including the approaches to 2500 W.

(TouchStone) stood some walls on the North end of Building 'A' then cleaned up the area and loaded their campers and left.

 (Red Oak) passed inspection for Building 'B' footings and garage foundation walls.