Monday 8/20/2012


Weather: Rain then Sunny  83˚/55˚

Subs on Site
<TouchStone>              (8)
<Red Oak>                    (7)
<DG Concrete>            (3)

Work in Progress:
(TouchStone) Continued framing the 3nd floor walls.

(Red Oak) Tied Bar in the floor for Building 'D' and started on the 2nd half of Building 'E' walls.

(DG Concrete) Cut Building 'B' parking lot and touched up the curb and gutter grade where Sterns needed.