Wednesday 8/29/2012

Weather: Partly Cloudy  88˚/57˚

Subs on Site
<Air Doctors>              (3)
<Sterns>                      (12)
<Red Oak Plumbing>   (5)
<Red Oak>                  (6)
<DG Concrete>            (2)

Work in Progress:

(Air Doctors)arrived with a camper and we went over their concerns about the plans see RFI #16

(Sterns) Continued down the road with curb and gutter pouring their tie ins

(Red Oak Plumbing) Started on underground for Building 'E'

(Red Oak)Finished tieing the bar for Building 'B' footings and started on Building 'B' garage foundation walls.




(DG Concrete)Started, at 2500 W, to fill in were needed in the parking areas along the road. Shad (DG Concrete) drove over the valve box for the fire hydrant with the track hoe and broke the 6" line on the hydrant side of the valve.  They had it fixed by the end of the day and started a chlorine bake.