Subs on Site
<TouchStone> (14)
<Red Oak> (7)
<DG Concrete> (2)
Work in Progress:
(TouchStone) Continued framing the 3nd floor walls.
(Red Oak) finished forming the 2nd half of Building 'E' foundation walls
(DG Concrete) re compacted the half of Club house footings that fail the test. and back filled around Buildings 'A', 'C', and 'D'
Steve (Clegg Steel) came out to the site and field measured for the stairs.